The heat is on. Most of you who read the blog would be unaware that we currently live in a rented flat. A rented flat which has a lease agreement that ends in 6 days. That means we have 5 days and counting to get the Tiny House into a state where we can move in.
Looking at what’s left, I think we are screwed. However I’ve always been the pessimistic one. To actually make it livable is probably only a few days work. I think I may have a few late nights coming up.
What’s left to complete on the Interior:
Kitchen Install + Sinks
Gas and Appliance install
All of the bathroom (walls, showers, taps)
Table Tops / Kitchen Benchtops / Cupboard shelves.
Remaining Plasterboard
Insulate the ceiling
‘Finish’ the plasterboard (gib, internals + Externals, fill holes)
Painting
Flooring
Nonetheless its been a productive week. The interior was completely insulated (excluding the ceiling). This included internal and external walls. We had a lot of insulation left over so we thought we would include the internal walls to help with sound reduction and warmth. The computer wiring is all installed. My remaining door locks and remote unlock system is working. The water system has been finished (I still need to test it for leaks before plastering over the joints). And the Kitchen shelving and walls have been built and plastered. The roof has also been covered in solar panels which are working well (I had to wait for new connectors as I had 3 faulty Y connectors, all male, which pissed me off). We are nearly there… We are nearly there. I tell myself this every day to keep myself going. Because some days the mounting “to do” list is daunting.
Apparently I’m not a Photographer: